Predicting location and evaluating progression of clogging in a permeable pavement parking lot.

Journal of green building(2022)

引用 0|浏览1
暂无评分
摘要
In 2009, a permeable pavement research and demonstration site was constructed at the Edison Environmental Center, Edison, NJ. Infiltration testing of three original permeable parking rows through August 2012 indicated that clogging occurred along the upgradient edge of these pavements from runoff that drained from adjacent impermeable driving lanes. A subsequent infiltration testing data collection effort from April 2017 through March 2020 focused on permeable interlocking concrete pavers (PICP) that replaces one of the original permeable surfaces. While the original infiltration study through 2012 used random locations throughout the permeable parking rows, the newer study targeted upgradient edge to identify where clogging would occur. Testing locations along the upgradient edge were selected based on a high-resolution survey (HRS) of the parking lot performed in December 2014. The HRS identified three low spots along the upgradient edge that eventually clogged in the new PICP infiltration study. The HRS may assist with maintenance routines. The newer study also supports the conclusion of the earlier study with regards to truncating the infiltration testing method, particularly for maintenance assessments.
更多
查看译文
关键词
ASTM C1701 and C1781,Green infrastructure,High-resolution survey,Infiltration,Maintenance assessment,Permeable interlocking concrete pavers,Permeable pavement,Storm water control measure
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要